High quality modular house factory

Best modular house supplier: Installation Efficiency – Flat-packed container house: The quick installation process ensures shorter construction times. A team of four workers can complete the installation of a single modular house in just 3 hours. Alternatively, the houses can be transported in full containers and connected to water and electricity on-site for immediate use. Light steel movable plank building: The installation process is time-consuming, taking 20-30 days, including pouring concrete foundations, constructing the main body, installing color steel plates, suspending the ceiling, and installing water and electricity. This method poses a high risk of operation and labor loss. Find additional info on modular house supplier.

Lida folding container house (foldable container house) is designed to meet the quick installation purpose in some emergency projects. One unit of folding container house can be installed within 3 minutes by 2 workers. It is widely used as Site office, Disaster relief materials reserve, emergency shelter house, site living room, meeting room, dormitory, shop, toilet, storage, kitchen, shower room and so on. Light material without overload, easy to pack and transport. Lida folding container house (foldable container house)can be assembled and disassembled more than 10 times, and the service life is more than 15 years.

Lida Group is the professional container house China and prefabricated house supplier since 1993. The main products of Lida Group contain modular house, prefabricated house, container house, temporary house, flat pack container house, large scale of labour camp, steel structure buildings, LGS Villa, and other integrated buildings, widely used in industry, traffic, city construction, commercial and other temporary accommodation.

Lida mining labor camp (labour Camp) building is made of light steel as structure and sandwich panels for wall and roof. Insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass, which is determined by the demand and environment requirements. Lida mining labor camp (labour Camp) buildings can be assembled several times after one site construction finished, installed easily and cost effective.

The Lida Group Integrated Campsite Warehouse is an important part of the integrated camp. The camp warehouse is usually a separate building used to store all kinds of materials in the camp operation process. The size of the warehouse is individually tailored to the future operational needs of the camp contractor. The Lida Group’s comprehensive camp laundry room adopts a light steel structure skeleton and is maintained by composite plates or color steel. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. Discover additional info on Lida Group.

The design concept of Lida greenhouse is “adhere to the principle of science and practicality; adhere to the principle of improving the utilization rate of land resources, energy saving, water saving and high efficiency; adhere to the principle of advanced, reliable and appropriate selection of greenhouse structural materials and equipment; adhere to the principle of world leading”. Lida greenhouse mainly includes greenhouse foundation, main structure, covering materials, ventilation system, internal sunshade system, fan wet curtain cooling system, power distribution and electric control system, etc. The greenhouse designed by our company adopts hot galvanized light steel structure, which has strong anti snow ability and long service life, and is committed to building excellent greenhouse projects for customers.

Lida Group Prefabricated House Supplier was established in 1993, as a professional steel buildings factory and exporter which is concerned with the design, production, installation and marketing of engineering construction. Lida Group container house China manufacturer has achieved ISO9001, ISO14001, ISO18001, EU CE certification (EN1090) and passed SGS, TUV and BV inspection. And we has obtained Second Class Qualification of Steel Structure Professional Construction Contracting and General Contracting Qualification of Construction Engineering.